
We also put in the door. Here we are finishing up putting nail flanges on the door. I primed it with purple pipe primer. I used a couple beads of construction adhesive, and a bead of "Through The Roof" so that it just squeezed out.

Then we finally set the door in place. This door has taken a while!

And got it fastened:

And taped:

And we finished up the sealing. There was a window that leaked where I glued on the nail flange, so I re-caulked it. And I caulked all the nail holes in the roof and walls. Zips isn't supposed to need this...but I felt it would help:

And then it SNOWED:



But our little house is nice and snug.