One sheet up below the window. A send sheet cut for above the window. I've got a tricky detail with the j-channel, so I will wait for more sheets before I fully attach the upper sheets.
Monday, February 27, 2017
Saturday, February 25, 2017
Friday, February 24, 2017
Wednesday, February 22, 2017
February 22, 2017 at 09:21PM
Getting that top sheet in makes it look so much more complete. Tomorrow I can finish the strip above the window, and then: onward to the copper. #CopperSiding
February 22, 2017 at 10:18AM
Finished another run of metal. I didn't have my camera, but I also put one small sheet on under the bathroom window on the other side. I'm wondering if I should be putting strips behind the metal, to give a ventilation layer.
Saturday, February 18, 2017
February 18, 2017 at 06:24PM
Put two more sheets up. Finished as the sun went down. Also, meet another local tiny-houser today. She's been in her self-built house for a couple months, with about the same house layout.
Thursday, February 16, 2017
February 16, 2017 at 10:22AM
Cut the top piece of metal. Duct taped it in place until I could get the fasteners in.
Saturday, February 11, 2017
February 11, 2017 at 07:25PM
Started cutting metal today and putting it up. Three pieces done! I cut the first piece with a skill saw (with an old blade on backwards). Had to wear ear plugs AND ear muffs. Later, I used a jig saw. Much better! Still wear ear muffs!
Sunday, February 5, 2017
February 05, 2017 at 03:02PM
I've started the trim around the down spout. I think I will cover the red boards with blue-painted cedar.
Saturday, February 4, 2017
February 04, 2017 at 02:42PM
I've got the blue boards pinned with nails over the wheels. Now I will caulk then and screw them in place.
Subscribe to:
Posts (Atom)