Putting up a copper trim piece. We had just enough for this, and one other trim nearby-- thanks to Beth's idea of a configuration that worked.
Tuesday, May 30, 2017
Saturday, May 27, 2017
May 27, 2017 at 09:39PM
Put the metal on the end of the reading nook. Doesn't the copper look great?! I found if I wore my hat on my face, it helped keep metal chips out of my mouth, and seal around my nose to keep the chips from slipping into my goggles.
Friday, May 26, 2017
Saturday, May 20, 2017
May 20, 2017 at 09:07PM
Another wall covered with metal. I also have two tours today, and sealed and mounted an outside electrical box.
May 20, 2017 at 09:40AM
Made holes and sealed around them, for the heat exchanger to go. Also, designed enough details on the heat exchanger that we knew where to put them.
Tuesday, May 16, 2017
Saturday, May 13, 2017
May 13, 2017 at 03:50PM
A buddy came by and helped. He knew a thing or two about good, neat, wiring. We also finished the plumbing to the point where we can now SPRAY FOAM. (Finally!)
Friday, May 12, 2017
May 12, 2017 at 09:13PM
Got the North vent sealed up and attached. There will be a white rain shield/cosmetic cover over this.
Thursday, May 11, 2017
May 11, 2017 at 09:04PM
Tee will face toward the hole in the wall. The fitting sitting in the lower left will be screwed in from the outside, sandwiching the metal. The hole is black because the temporary tape stayed on in the rain :)
May 11, 2017 at 06:41PM
Well, it's raining today, but here are pictures from earlier in the week: marking out a hole for a vent pipe, and then once it was cut, the sunset through it.
Wednesday, May 10, 2017
Sunday, May 7, 2017
May 07, 2017 at 04:57PM
A new angle on metal installation: diagonal ribs. Here I'm marking for a hole for a wire for a light by the door.
May 07, 2017 at 03:40PM
I got some torx screw bits. I could have continued to make-do with what I had, but after all, torx is the future.
Saturday, May 6, 2017
Wednesday, May 3, 2017
Subscribe to:
Posts (Atom)