Here is the kiln I used to bake the bugs out of the cedar boards. Kept it at about 150 degrees for 5 hours, which was well over the worst bug's time/temp values. Here it is moved back by my house, but while it ran, I parked it away from anything else, in case it caught fire.
I machined the floor (using a router) for the sloping drain trough. Tonight I lathe'd the drain clamp-ring to change it from a threaded to glued joint. It's so good to be using a lathe again!
My parents came out and helped put in the wood flooring in the other loft. Also (not pictured), my mother on a ladder, caulking the nail holes, finishing the walls
I looked at it, and I thought a bit, and I looked at my frozen chum. Then, "Here!" said I, with a sudden cry, "is my crematorium". --The Cremation Of Sam McGee, Robert Service
First coat of green paint on the floor! We painted a third of the house with this copper-sulfate milk paint. It should turn green with time, and the CuSO4 should kill mold.