Sunday, April 22, 2018

April 22, 2018 at 12:47PM


Detailing some of the last tiles. All of them are installed. Now I need to feather the edges and do grout!

Sunday, April 1, 2018

April 01, 2018 at 09:15PM


Cut a hole in the wall (see the tree in top center: those grow outside). This is for the stovepipe. I tell you, it's hard to cut hole through the sheathing, bigger than the hole through the metal! I hope that's the hardest part of this!

April 01, 2018 at 09:08PM


Spreading the last layer of liquid-applied shower waterproof membrane. I had just enough! It was like the widow's oil (Bible story, where God supplied, as much as they needed, until they ran out of places to put it)

Sunday, March 11, 2018

March 11, 2018 at 08:55PM


Spreading glue and putting down rubber to be the "layer of last resort" -- if the other layers leak, this one should catch it and take it to the weep holes.

March 11, 2018 at 08:52PM


Spreading mud to glue down the tapered foam that will support the shower tile.

Sunday, February 25, 2018

February 25, 2018 at 09:27AM


Putting Tung oil on the table I just installed. This is made from slabs that my brother and I cut out of a tree.