Sunday, August 28, 2016

August 28, 2016 at 10:11PM


Here is the wiring diagram for our tiny house. I'll probably redo it when I'm done, to accurately show wherever I ended up doing. But I think this will tell me enough to drill the holes and run the wires.

August 28, 2016 at 09:54PM


A bit more work today on the loft extension: adding a new stud, and attaching the last joist to it. Connected the end of the house to the existing loft.

Saturday, August 27, 2016

August 27, 2016 at 09:30PM


Cut some joists, put them together and attached them to the house. Even without more bracing, I can stand on them.

August 27, 2016 at 09:20PM


Removed the window. Cut out the wall. And got ready to put in an extension.

August 27, 2016 at 12:20PM


Beginning the process of adding the reading nook by removing these nailers. Tobias did a great job building this - he's working really hard to just get them loose. -Beth #builtbymyengineer

Wednesday, August 24, 2016

August 24, 2016 at 07:53PM


Tobias is getting ready to wire the kitchen. Looking forward to cooking meals in a nicely lit workspace. -Beth

Sunday, August 21, 2016

August 21, 2016 at 10:17PM


Finished the main switch panel at the entry door of the house. From left to right: outside light, main light, mood lighting, fan, and then a three way for the bathroom inside and outside.

August 21, 2016 at 08:00PM


First wall cavity insulated! We needed to put it in before we hid it behind framing.

August 21, 2016 at 02:59PM


Side view, of the structural detail, of the bump-out/mini loft extension.

Saturday, August 20, 2016

August 20, 2016 at 10:06PM


I need to rotate the little window on the end--i don't notice it was a horizonal window, not a vertical. I'm thinking of adding a bay window/reading nook out the end while I'm at it. What do you think?