Saturday, November 19, 2016

November 19, 2016 at 10:34PM


Today we visited a metal siding manufacturer, and got some metal tubes at the Yard Store (not shown). Then this evening I made some trim for the bottom of the wall, and around the tail light. I'll probably do the other side using a faster method.

Thursday, November 17, 2016

November 17, 2016 at 06:02AM


We cut and installed insulation. We finished the west end of the north wall. From the window to the bathroom.

Tuesday, November 15, 2016

November 15, 2016 at 09:44PM


Slid the door in, nailed it in place, and put on zip tape. Had only a little tape left over.

November 15, 2016 at 09:31PM


With the sill pan done, put on a little strategic caulk, and attached it to the door.

Monday, November 14, 2016

Saturday, November 12, 2016

November 12, 2016 at 06:46PM


Made corners for the sill pan under the door. I glued one corner to the sill pan, but I still have one left. It has been really nice to have the door hanging from the "crane" I made--i can test-fit the flashing as I make it.

Tuesday, November 8, 2016

November 08, 2016 at 07:44PM


This is two pictures of some proposed trim to finish water-proofing the bottom corner of the door. It is nice to have door hanging from a wall-mounted "crane"so I can easily work on it and try different things without having 3 guys to lift it in and out.

Saturday, November 5, 2016

November 05, 2016 at 10:11PM


The door leaked, so we took it out and made a sill-pan to keep the water out of the house.

Thursday, November 3, 2016

November 03, 2016 at 08:18PM


Started the project of removing the door and fixing the flashing so that water doesn't get in anymore. That door was caulked in so tight! (but the bottom leaked--weakest link)

Tuesday, November 1, 2016