Thursday, January 14, 2016

Sheathing Day

We had some friends over, and put sheathing on half the walls.
Here is the first sheet up, need and square. We let the extra hang down below the edge of the trailer. I can either strike a line and trim it off, or build some structure to hold it, and let the walls extend down farther. I can fill it with insulation, and that will help---right now the corner between the wall and floor is pretty lacking in insulation.


Rusty and Tobias putting up an angled sheet. Two rows done!

One long wall down, the short wall goes fast:

Started on the other long wall, and then called it a day. Here is some of the crew:

No comments:

Post a Comment